Whole-house renovation — Guide and instructions
Example values, assumptions and checks
Input · Output
- Input
- m²
- Output
- cost
Input and settings example
KR; 85 m²; standard; +5%Expected result example
(materials + labor) × 1.05; demolition excludedCheck the result
amounts, applied rates and included costs
Technical background
Estimate a whole-house renovation budget from total area and finish grade.
Inputs, formulas and assumptions
The current whole-house model uses entered area × 0.85 with flooring references and a labor basis. It is not a total assembled from separate bathroom, kitchen, electrical and plumbing bills. Contingency applies to the subtotal including selected demolition; detailed work selections do not change the total item by item. When adding room estimates, separate scopes so flooring, demolition and shared work are not counted twice.
Practical exceptions and limits
Calculations use your inputs and stated assumptions. Verify actual costs, taxes, fees, exchange rates and contract terms separately.
How to use it
Check the whole-property area, country and city.
Calculate using the project’s material grade, demolition and reserve.
Compare included work before adding separate room quotes.
When the result differs
Do not enter the number of rooms as area. Align units, demolition and reserve and compare the scope included in each quote.
Privacy and data processing
The normal operation runs in your browser without uploading the input or files to a remote processing service. Loading the page or its software assets can still use the network. Review any result before you copy, save or share it.
Frequently asked questions
Can I add all room, kitchen and bathroom estimates?
This is a separate area-based estimate, not an automatic sum of individual spaces. Adding both can count the same work twice. Compare major equipment and structural changes separately with a site quote.
What input formats does this tool use?
Input: m².
Which example can I start with?
Input and settings example: KR; 85 m²; standard; +5% Expected result example: (materials + labor) × 1.05; demolition excluded
What should I check in the result?
Output: cost. amounts, applied rates and included costs
What limitations should I know before using it?
Calculations use your inputs and stated assumptions. Verify actual costs, taxes, fees, exchange rates and contract terms separately.
Operator, technology and rights
Operator
4utoolhub
Interface and processing
The interface uses React and is built with Vite. Algorithms, libraries, WASM and models vary by tool. Check the tool’s guidance and processing policy for file transfer and storage scope.
File processing & server transferRights to your material
Process material you own or have permission to use. Third-party libraries, fonts and images retain their respective licenses; converting a file does not grant new usage rights.
Terms of useLocal browser processing does not imply automatic encryption or secure deletion. Review transfer, storage and privacy guidance before using sensitive material. Privacy policy
© 4utoolhub